Hitze Insights
Specification, certification and sourcing guides for wholesalers, contractors and private-label brands — written from the Hitze engineering desk.
Latest research

Decode legacy NSF 61-G and section numbers 4, 8 and 9, then separate a marking’s meaning from the current product listing and…
Read guide →
Match the tested firestop system to your plastic pipe, couplers and site conditions. Build a traceable US/Canada submittal before installation.
Read guide →
Specify polypropylene pipe by service, material and joining system. Separate pressure-water evidence from non-pressure corrosive-waste requirements.
Read guide →
Size a sleeve for PP-R and plastic pipe: code and spec clearances (IPC 305.3, NJ 2.12, MasterSpec 220517), wall movement, insulation, the…
Read guide →
IPC 2024, UPC 2021 and IRC 2024 clauses by metal pair, ASSE 1079 ratings (125 psi at 180 °F minimum), field failure…
Read guide →
A schedule fixes one wall per pipe size; an SDR fixes the OD-to-wall ratio; PN sets no wall. Figures from ASME B36.10-2022,…
Read guide →
Gauge Rp, R, G and NPT brass-insert threads on PP-R fittings at goods-in: ISO 7-2 step plugs, the ISO 228-2 two-turn NOT…
Read guide →
ISO 15874-3 requires four marks on a PP-R fitting body; cavity and lot codes are optional. How to trace a failed fitting…
Read guide →
Hitze took India's plumbers to the mountains for a full day of PPR training, product demos and an evening of live music.…
Read guide →
PP-R cannot be fused to HDPE. The three permitted transitions by size band, the bolt torque and re-torque rules, and what to…
Read guide →Get Started
Tell us your market, product lines and volumes — we reply with pricing, MOQ and the certification documents for your region.