Solution · Project & Spec Supply

Project & Spec Piping Supply — One Certified System for MEP & Developers

Spec Hitze into your project and source the whole water path from one accountable German brand: PEX, PEX-AL-PEX multilayer and PE-RT pipe with matched fittings and underfloor-heating manifolds.

Submittal-grade DoP and TDS data, BIM support, a system-level warranty and delivery phased to your construction program. Certified to cUPC, NSF-61, DVGW, WRAS and CE (with DoP), for projects across North America and Europe.

Trade & project supply only — MEP consultants, developers, contractors and distributors. Not a retail storefront.

Hitze pipe extrusion lines and pipe coils in the production workshop, ready for project supply cUPC · NSF-61 · DVGW · WRAS · CE + DoP

Single-Source System

Spec One System, Not Three Vendors — Pipe, Fittings & Manifolds Under One Brand

Split the piping package across suppliers and you own the interface risk. Specify one certified system and one source is accountable for the whole water path.

Hitze supplies the complete potable and hydronic water path as a single, matched system: multilayer PEX-AL-PEX and PE-RT pipe with an EVOH oxygen barrier per DIN 4726, PEX for heating and potable, press / push-fit / compression / brass fittings matched to the pipe, and underfloor-heating manifolds. Because every component shares the same brand, the same jaw profiles (TH / U / F / M) and the same certification family, compatibility is designed in — not something your installer discovers on site. Lead-free / DZR brass (CW724R / CW511L / CW602N) meets potable requirements — see our lead-free brass press fittings — and the whole system is certified to cUPC, NSF-61, DVGW, WRAS and CE with DoP.

Utility room with boiler, pump and expansion vessel connected by Hitze heating pipe — one matched water path
One water path — pipe, fittings & manifolds under one brand
System componentLineStandardsRole in the water path
Multilayer PEX-AL-PEX pipeMultilayer PEX-AL-PEXEN ISO 21003, ASTM F1281/F1282Heating + potable risers/mains
PEX pipePEX PipeEN ISO 15875, ASTM F876/F877Heating + potable distribution
PE-RT underfloor heating pipePE-RT UFH PipeDIN 4726 (O₂ barrier)Hydronic radiant loops
Press / push-fit / compression / brass fittingsPress FittingsNSF/ANSI 61, lead-free / DZR brassJoints, transitions, isolation
Underfloor heating manifoldsUFH ManifoldsMatched to system pipeLoop distribution + balancing

Request Project Consultation

Submittal-Grade Data

BIM Objects, DoP & TDS You Can Drop Into the Spec

A brochure doesn’t clear a submittal. MEP consultants get modeling and compliance data built to go straight into the design and the approval package.

For the design stage, Hitze provides BIM objects so pipe, fittings and manifolds load into your Revit or IFC model without rebuilding families by hand. For the submittal, every product carries a Declaration of Performance (DoP) — backed by held CE certification — and a Technical Data Sheet (TDS) with pressure/temperature ratings, dimensions, tolerances and standards, so you cite real numbers in the spec instead of chasing a rep for a datasheet before deadline. Certification references (cUPC / IAPMO, NSF-61, DVGW, WRAS, CE + DoP) accompany the package; certificate and listing numbers are provided in the Hitze Cert Pack and are verifiable at source.

Test and inspection certificate for PP-R pressure pipes — documentation for the submittal package
BIM family in Revit → DoP + TDS → submittal package
Submittal assetFormat / basisStatus
BIM objects (pipe / fittings / manifolds)Revit .rfa / IFC — format & coverage detailed in the technical data sheetAvailable on request
Declaration of Performance (DoP)CE + DoP (held)Available — DoP number on request
Technical Data Sheet (TDS)Pressure/temp, dimensions, tolerance, standardsAvailable per line
Certification referencescUPC / NSF-61 / DVGW / WRAS / CEHeld — numbers in the Hitze Cert Pack, verifiable at source

Download the Spec & Submittal Pack

DoP + TDS across the system lines, the BIM library index and a system-warranty overview. Email required · certificate and listing numbers are provided in the Hitze Cert Pack and are verifiable at source.

Download BIM & DoP Pack

Certifications & Compliance

System Warranty

One System, One Warranty — Coverage on the Assembly, Not Just the Pipe

A pipe warranty is worthless if the leak is at a fitting from another brand. Specify a matched system and the warranty covers how the parts perform together.

When pipe, fittings and manifolds come from one brand, tested and certified as a set, the warranty can cover the assembled system rather than a single component — which is what a developer actually needs on a build that has to perform for decades. Mixing brands at the joint is where responsibility fractures and where a claim gets denied. A same-brand Hitze system removes that gap: one accountable source stands behind the whole water path, backed by a 50-year warranty on the matched Hitze pipe-and-fitting system. Coverage terms are confirmed per project.

ISO 45001 certificate of registration covering composite pipe and fittings manufacture
System warranty document over project drawings — matched pipe / fitting / manifold
1
Accountable source for the whole water path
1
Certification family across pipe, fittings & manifolds
50
Year warranty on the assembled system, not one part
0
Mixed-brand joints to fracture a claim
Warranty pointDetail
ScopeAssembled same-brand system (pipe + fittings + manifolds)
ConditionMatched Hitze components, installed to spec
Warranty term50-year warranty on the matched Hitze pipe-and-fitting system
Coverage termsCoverage, claim process and exclusions confirmed per project

The matched Hitze pipe-and-fitting system carries a 50-year warranty; full coverage terms are confirmed per project — see the system-warranty page for the current program.

Request Project Consultation See System Warranty

Phased Delivery

Material Lands When the Trade Needs It, Not Before

Everything on site at once clutters the build and ties up cash; late material stalls a trade. We plan releases against your construction program.

1

Rough-In

Distribution pipe released first so the plumbing trade can run the water path before walls close.

2

Manifolds

Underfloor-heating manifolds and matched fittings land as the loops go in — not sitting exposed on site early.

3

Fit-Out

Finish fittings and isolation components arrive at fit-out, so each trade gets its material on schedule.

Instead of one dump delivery, project supply can be released in phases tied to your program — rough-in pipe first, manifolds when the loops go in, fittings and finish components at fit-out — so material arrives when each trade needs it and doesn’t sit exposed on site. For importers and contractors buying by the container, mixed-SKU loads are planned for fill rate so you’re shipping product, not air — install crews can also work through our radiant heating supply for contractors & installers. Phasing schedule, lead time and shipping documentation are set at consultation.

Hitze warehouse team with a Hitze packing box preparing a mixed-SKU project load
Mixed-SKU loads planned for fill rate — pipe, fittings & manifolds together
Logistics pointDetail
Delivery modelPhased releases tied to construction program
Typical phasesRough-in → manifolds → fit-out (tailored per project)
Lead timeConfirmed at consultation against your construction program
Container loadingMixed-SKU planned for fill rate (40HQ)
Shipping docsCompliance set + Certificate of Origin + invoice / packing list / BoL

Trade-only note: This page and its project pricing are for the trade — MEP consultants, developers, contractors, distributors and importers. Not a retail storefront; no consumer single-unit sales.

Plan Phased Delivery for My Project

Warehouse & Supply

Stock on Pallets, Ready to Release to Your Program

Coiled pipe and branded fittings cartons staged on pallets in the warehouse — the same stock that ships in phases against your construction schedule.

How We Supply a Project

From Spec to Phased Delivery — How Hitze Backs a Build

Start with samples or a small trial order — there is no minimum order quantity. Scale to full container supply once the system is specified into your project. Every value below describes how Hitze supports the buyer, not a single fixed deal.

Here is how a project engagement runs — from the first sample to phased delivery on the matched pipe, fitting and manifold system.

A project buyer typically starts with samples or a small trial order — Hitze has no MOQ, so you can validate the pipe, fittings and manifolds before committing to volume. From there the certified system is specified into the design with submittal-grade DoP and TDS data, then released in phases tied to the construction program. Whether you are a developer, MEP consultant or general contractor in North America or Europe, one accountable source stands behind the whole water path, backed by the 50-year system warranty.

Whole-house hydronic plant room with boiler, cylinder and manifold feeding a radiant floor loop
Whole-house hydronic plant room — matched pipe, fittings & manifold in the water path
Engagement detailHow Hitze supports it
Buyer typeDevelopers, MEP consultants, general contractors, distributors and importers
RegionProjects across North America and Europe
Project typeMulti-unit residential, commercial hydronic and whole-house piping builds
System suppliedMatched pipe lines + fittings + underfloor-heating manifolds, one brand
First-order scopeNo MOQ — start with samples or a small trial order, scale to container supply
TimelineSpec-in with DoP/TDS → phased delivery to the construction program → 50-year system warranty

A single-source system, submittal-grade DoP/TDS data and delivery phased to your program are built to take project risk out of the water path — one accountable brand from the extrusion line to the riser.How Hitze supports project & spec buyers

See Project Case Study Request Project Consultation

FAQ

Project & Spec Supply FAQ

Is a BIM library available for specifying the system?
For the MEP ConsultantYes. BIM objects let pipe, fittings and manifolds load into your Revit or IFC model at design stage. Alongside them you get submittal-grade DoP and TDS data to cite directly in the spec. The BIM library index and coverage are detailed in the technical data sheet, available on request — request the current data pack to see what’s ready now.
Do you provide a DoP for the submittal package?
For the MEP ConsultantYes. Hitze holds CE with a Declaration of Performance (DoP), plus cUPC, NSF-61, DVGW and WRAS. The DoP and matching TDS (pressure/temperature ratings, dimensions, standards) drop straight into your submittal, and each shipment carries the compliance set your inspector needs. Certificate and listing numbers are provided in the Hitze Cert Pack and are verifiable at source. See our certifications page.
Do you offer a system warranty covering the whole system?
For the DeveloperUsing matched same-brand pipe, fittings and manifolds means one accountable source, not split responsibility across vendors. The matched Hitze pipe-and-fitting system is backed by a 50-year warranty on the assembled system — which protects you where mixed-brand joints usually fracture a claim. Coverage terms are confirmed per project.
Why source the whole system from one supplier?
For the DeveloperOne brand for pipe, fittings and manifolds means designed-in compatibility (same TH/U/F/M profiles, one certification family: cUPC, NSF-61, DVGW, WRAS, CE), one submittal, one warranty and one point of contact. You stop owning the finger-pointing when a joint has to perform for decades on a long-life building.
Can delivery be phased to our construction schedule?
For the ContractorYes. Material can be released in phases tied to your program — rough-in pipe, then manifolds, then fit-out components — so it lands when the trade needs it, not early to clutter the site or late to stall work. Phasing schedule and lead time are set at consultation. Request a project consultation to plan releases.
Which pipe lines can go into one project package?
For the ContractorThe full water path from one brand: multilayer PEX-AL-PEX and PE-RT pipe (EVOH oxygen barrier per DIN 4726), PEX for heating and potable, press/push-fit/compression/brass fittings and underfloor-heating manifolds — all certified to cUPC, NSF-61, DVGW, WRAS and CE. One PO covers pipe, fittings and manifolds together.

Get Started

Spec Hitze Into Your Project

Tell us your project type, scale and region — we reply with a single-source system spec, submittal-grade DoP/TDS data and a phased-delivery plan tied to your program.

Request Project Consultation Download BIM & DoP Pack